Foundry Roof WorksLaguna Woods’s shortcut to three honest roofing quotes.(949) 658-0031Free inspection

Guide

What to do, and when

Most of what shortens a roof is neglect of things that take twenty minutes: a blocked valley, a lifted flashing, a gutter full of grit.

Or call (949) 658-0031
Guide7 sections1 min readLaguna Woods, CA

Get it looked at

Three questions, and up to three Laguna Woods contractors. Free either way.

Or call (949) 658-0031

Free · Nothing to pay, ever

Get it looked at

Three questions, and up to three Laguna Woods contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free either way, and never more than three contractors.

Look in the attic after heavy weather

The attic shows a leak long before the ceiling does. After any serious storm, take a torch up and look at the underside of the deck around penetrations and valleys.

Cut back anything touching the roof

Branches abrade the surface in wind and drop debris that holds moisture. Keep growth well clear of the covering, and clear of the gutters while you are at it.

Deal with growth properly

Cleaning a roof aggressively does more damage than the growth was doing. Gentle treatment, patience, and a strip at the ridge to stop it returning.

Keep the penetrations honest

Rubber pipe boots are the single most common source of leaks on an otherwise sound roof, and they are cheap to replace before they fail.

Clear the gutters before the wet season

Gutters full of grit are not just a drainage problem — the grit is your roof, and its presence tells you something about how far along the covering is.

Twice a year, from the ground

Walk the perimeter with binoculars if you have them. You are looking for missing or lifted material, dark patches, sagging lines, and anything growing where it should not be. Ten minutes, twice a year.

In short

Put two dates in the calendar, one either side of November through March. That is the whole programme.

Related questions

How quickly will someone call?

Usually within the hour during working hours. If you marked the job as an emergency it goes to the front of the queue and is normally picked up faster than that.

How long does a re-roof take?

Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.

What happens to my information?

It goes to a maximum of three roofing contractors working in Laguna Woods, and to nobody else. We do not sell it as a mailing list and we do not post it anywhere public. Our privacy policy sets out exactly what is shared.

Start with a free estimate

Three questions, about a minute, and up to three Laguna Woods contractors come back to you.

(949) 658-0031Call nowFree inspection